SED · Smart Energy District

Probabilistic forecasting of net active and reactive power in the Marly low-voltage grid

Yverdon WorkshopNovember 2026
HES-SO
power to the customers solar power back into the grid
Contents
  1. 01The questionwhat a day-ahead forecast is for
  2. 02The districtMarly, and what we can see of it
  3. 03What makes it hardthree obstacles in the data
  4. 04Our approachthree levels, and an interval rather than a number
  5. 05Where we are, and what we needfirst results, and the one thing missing
01

The question

What a day-ahead forecast is for

    01The question

    What a grid operator would like to know

    What will each part of this district draw from the grid, or push back into it, tomorrow, quarter hour by quarter hour?

    01The question

    Measured today, forecast tomorrow

    The measured day is the real total of the district's 184 customer nodes. The forecast day is the sum of the node forecasts; its band is approximate, drawn to show the shape of the output.

    01The question

    Why an interval and not a number

    Decisions taken today are about capacity

    How much flexibility to reserve, which feeder to watch.

    A single predicted curve hides how wrong it could be

    A range does not.

    02

    The district

    Marly, and what we can see of it

      02The district

      Marly: a real district, fully metered at the customer

      ★18 kV feed-in transformer station consumer prosumer both
      0
      nodes
      0
      transformer stations
      0
      smart meters
      0
      hops, deepest feeder
      03

      What makes it hard

      Three obstacles in the data

        03What makes it hard

        Three things make this harder than it looks

        0
        meters reporting by August 2026, from 5 in 2022

        The fleet is young.

        0days
        between the first and the last meter of one node

        Meters in the same node arrive years apart, so a building's history is a staircase rather than a record of its behavior.

        0
        meters at the 13 transformer stations

        Nothing is measured at the transformer. A station's load can only be rebuilt by adding up the meters below it.

        03What makes it hard

        The fleet is young

        923
        meters reporting in August 2026
        5 in 2022
        04

        Our approach

        Three levels, and an interval rather than a number

          04Our approach

          Our approach

          Forecast every level, and keep them consistent

          A forecast for a station should equal the sum of the forecasts beneath it. That consistency is what makes the numbers usable.

          Give a range, not a line

          Each forecast carries an interval, so an operator can size a margin instead of trusting a single value.

          Hierarchical reconciliation is the direction being adopted; it is not yet implemented.

          04Our approach

          Pipeline

          Hierarchical reconciliation is the direction being adopted; it is not yet implemented.

          05

          Where we are, and what we need

          First results, and the one thing missing

            05Where we are

            A real day-ahead forecast

            Node 123, a prosumer Tuesday 29 September 2026 net active power, every 15 minutes

            measured forecast, median 90 % interval
            0kW
            mean absolute error on this day
            0%
            lower error than repeating yesterday, over 30 test days
            0%
            of measured values inside the 90 % interval, over 30 test days
            05Where we are

            The same day, reactive power

            Node 123, a prosumer Tuesday 29 September 2026 net reactive power, every 15 minutes

            measured forecast, median 90 % interval
            0kvar
            mean absolute error on this day
            0%
            lower error than repeating yesterday, over 30 test days
            0%
            of measured values inside the 90 % interval, over 30 test days
            05Where we are

            Where we are

            Done

            Day-ahead forecasts with 90 % intervals now exist for every customer node in the grid: 184 nodes, active and reactive power, across all 13 transformer stations.

            Making the station and grid levels consistent with them is the next step.

            05What we need

            The one thing missing

            A measurement at the transformer, even for a single station.

            Today a station's load can only be estimated by summing the meters below it, which leaves out public lighting, station auxiliaries and losses, and gives us nothing to check the estimate against.

            SED · Smart Energy District

            Thank you

            Questions
            HES-SO · Yverdon Workshop · November 2026